Neutral-Atom Platform Technologies
This action aims to establish European leadership in neutral-atom quantum simulation and digital quantum computing by delivering: • Fully programmable industry-ready quan…
Horizon Europe · European Union
Opens 4 Aug 2027
The EU's Horizon Europe programme expects to make 3 awards of €9.5 million each, from a total budget of €28.5 million. Applications close on 1 Dec 2027 (EU calls usually close at 17:00 Brussels time). Organisations in EU member states and Horizon Europe associated countries such as Türkiye can usually take part; the topic conditions control.
Project results are expected to contribute to all the following expected outcomes:
• Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively;
• Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs;
• Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services.
Projects are expected to address all the following items:
• Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated;
• Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility;
• Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations;
• Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid;
• Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software solutions and or software modules;
• Develop a manual and propose best practices on this matter to be used by other DSOs (including instructions to operate the system). Identify remaining gaps and further needs for research and development.
The demonstration, test and validation of the activities should be carried out in at least two pilots in different EU Member States or Associated Countries.
Projects are expected to include at least three Distribution System Operators (DSOs) and at least two universities and/or research organisations.
Additionally, collaboration is encouraged with the following entities:
• at least one supplier of technology and solutions for ADMS;
• at least one transmission system operator, which manage grids that are connected to the grids operated by any of the DSOs that are partners in the project;
• (at least) one project funded under the separate call ‘Advanced TSO control rooms to enhance grid control and resilience’ with the view to strengthen TSO-DSO coordination and support interoperable solutions. To that end, the project proposals are expected to describe a credible mechanism to do so.
This collaboration (minimum number of entities) is sought per project in total and does not necessarily apply per each pilot in particular.
Selected projects are expected to contribute to the BRIDGE initiative [1] and actively participate in its activities.
Technology Readiness Level - Technology readiness level expected from completed projects
Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.
[1] https://bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/
Consortium of at least 3 independent legal entities from 3 different EU Member States or associated countries, at least one in a Member State (Horizon Europe standard rule).
Applicant categories are a starting point. The official call decides eligibility.
Single-stage call. Next deadline 2027-12-01. The portal states the exact cut-off time (EU calls usually close at 17:00 Brussels time).
| Fact | Value | How we know | Taken from the source |
|---|---|---|---|
| Deadline | 1 December 2027 “Single-stage call. Next deadline 2027-12-01. The portal states the exact cut-off time (EU calls usually close at 17:00 Brussels time).” | official data field | 15 Nov 2026 |
| Amount per applicant | Unknown — not stated in the source we hold | unknown | — |
| Total budget | €28.5 million | official data field | 15 Nov 2026 |
| Funding rate | 70% for companies, 100% for non-profits | programme standard rule | 15 Nov 2026 |
| Who can apply | Consortium of at least 3 independent legal entities from 3 different EU Member States or associated countries, at least one in a Member State (Horizon Europe standard rule). | programme standard rule | 15 Nov 2026 |
| Where to apply | Read the topic conditions on the EU Funding & Tenders Portal for eligible countries, consortium requirements, budget and the application route. | read from the official text | 15 Nov 2026 |
Facts on this page come from the funder’s official data, taken on 14 Nov 2026. The funder's own documents, including later amendments, always take precedence.
This action aims to establish European leadership in neutral-atom quantum simulation and digital quantum computing by delivering: • Fully programmable industry-ready quan…
This action will strengthen Europe's strategic autonomy in quantum-secure communications by advancing core QKD technologies and integration capabilities. Expected results…
This action will strengthen Europe's leadership and strategic autonomy in quantum technologies by advancing experimental pilot line capacities as a vital stepping stone t…
This action will establish a pan-European open-access testing and experimentation infrastructure for quantum technologies, enabling systematic validation and certificatio…
This action will consolidate Europe’s position in superconducting quantum computing through: • Establishment of a full-stack superconducting quantum computer aiming at 1.…